Help us protect our roads

 

 

Each spring, the Ministry of Transport determines the dates of the thaw period for the three areas that make up the province.

During spring thaw, the road is more fragile than normal. Only one vehicle overload can cause him serious damage. By cons, a small decrease in costs significantly reduces the damage to the roadway. That's why loads of restrictions are imposed on heavy vehicles during a thaw. The thaw period is determined as a result of monitoring the progress of the thaw in the roadway.

 

Dates for the thaw period 2018

 

Zone 1

From Monday, March 5th (00 h 01) to Friday May 4th (23 h 59)

 

Zone 2

From Monday, March 19th (00 h 01) to Friday May 18th (23 h 59)

 

Zone 3

From Monday, March 26th (00 h 01) to Friday, May 25th (11:59 pm)

 

 

Depending on changing weather conditions, the start and end of the load thaw period may be delayed or delayed.

 

 

For more information!

French Only 

 


 

Get ready for the season

Take advantage of the thaw period to maintain your equipment!

 

 

 

Since you are limited to transporting your equipment, why not take advantage of it to maintain your equipment? Our team moves to construction sites to inspect your systems.

 

Find your local distributor