fbpx

 

                               

Inspect your lubrication system before winter!

Complete inspection in fall

 

The beginning of fall is the perfect season to do a full inspection of your lubrication systems. Especially for snow removal equipment and also for construction equipment. Scheduled inspection will allow you to detect and resolve problems before the work. Keeping your equipment in optimal condition can be more productive!

 

 

 

The most important step; grease change

Cold weather is just around the corner, it's important to replace summer grease (EP NLGI 2) of your ALLFETT lubrication systems with winter grease (EP NLGI 1 or 0) . Grease is the key component of your lubrication system. The type of grease chosen is particularly important for the operation of the system and will have a direct impact on its efficiency.

 

Consult our online guide for more details about recommended greases for ALLFETT systems, grease compatibilities or for grease change procedures .

 

 

 

Who does the inspection?

 

1. Us

The inspection of the lubrication system can be entrusted to a workshop recognized for the services of Allfett systems. This saves you time and ensures that all points are covered. An inspection report is provided to you for each equipment inspected.

 

Consult the list of authorized distributors:

 

 

2. You

Inspection can also be done by your team if you have time. Order now your pressure gauge kit compatible with several brands of automatic lubrication system:

 

 

Other tools are available to guide you in your operations. A dedicated section is also available in your Allfett service manual.  

 

Download the inspection grid:  

 

 

 

Step not to be neglected: Daily summary inspection

 

A summary visual inspection should be made on a daily basis by the operator:

  • Check if there is a thin layer of fresh grease at each lubrication point 
  • Make sure all hoses and adapters are in place and not leaking
  • Check the electronic card to make sure there are no alarms
  • Summary inspection ensures that once the equipment is up and running, everything is functional. No need to turn back for a minor break and lose production time.

 

Do a test cylce (additional cycle button) on the electronic card to make sure that the pump works well and that the pressure rises on the pressure gauge of the pump

 

 

You have questions?

 

Contact our technical department and we will be happy to help you!

450.218.6677 

This email address is being protected from spambots. You need JavaScript enabled to view it. 

 

 

 

Don't wait until problems occur!

Contact your sales representative to know which products if offered for your industry.